ZNLS ENGINEERING CO., LTD.

ZNLS ENGINEERING MOST EXCELLENT FORMWORK SOLUTION

Manufacturer from China
Active Member
9 Years
Home / Products / Automatic Climbing System /

Advanced Design Automatic Climbing System For High Building AC50-2

Contact Now
ZNLS ENGINEERING CO., LTD.
City:beijing
Province/State:beijing
Country/Region:china
Contact Person:MsSophia
Contact Now

Advanced Design Automatic Climbing System For High Building AC50-2

Ask Latest Price
Brand Name :ZNLS
Model Number :PF-AC50
Place of Origin :China
MOQ :25 tons
Price :Negotiation
Payment Terms :30%TT, Balance against copy of BL
Supply Ability :400 to 500 tons per month
Delivery Time :14 to 21 days after deposit
Packaging Details :In bundle or pallets, or by customer demands
Raw Material :Steel
Surface treatment :Powder coated
Lifting method :Self Climbing , Hydraulic Drive
Load capacity :5 tons
Integrated platform no. :4 platforms for independent work
Climbing rail :Different length available
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

AC50-2 Automatic climbing formwork - Fast, efficient auto-climbing formwork system for High Building

Overview

Auto-climbing system AC50-2 is composed of formwork system, bracket system, hydraulic system, anchor system. It guarantees simple procedure of assembly and climbing without any lifting machine, so it is the best choice for construction.

Characteristics

1 . The self-climbing hydraulic is equipped with an operating platform. As such, workers are not required to do the set-up and this help to save on manpower and materials.

2 . There is low error rate in the construction of the structure. Errors can be easily rectified at each level.

3 . The formwork is able to climb automatically and to be cleaned onsite. As such, this will significantly increase crane operational efficiency.

Climbing Process Flow

1 . Erect formwork, use cone suspension and lateral bracing to secure the formwork. Commence the first round of concrete pouring.

2 . Dismantle the formwork and install the Anchor shoe. Lift the bracket and formwork, install the middle platform, position the formwork correctly and commence on the second round of concrete pouring.

3 . Raise the formwork and brackets to a higher level, attached the guard rail, hydraulic system and suspended platform.

4 . Close formwork and commence on the third round of concrete pouring.

5 . Dismantle the formwork and shift it backwards, attached it on the wall and climb rail.

6 . The Brackets reached its designated position.

7 . Close formwork, commence on the concrete pouring, and the standard climbing process commences.

Advanced Design Automatic Climbing System For High Building AC50-2

Inquiry Cart 0