
Add to Cart
J200-1 Jumped climbing formwork - High bearing capacity climbing system
Overview
J200-1 climbing system is mainly used for concrete pouring in the wall, the core wall, the pier, etc. They guarantee simple handling, fast concreting cycles and problem-free adjustment to different wall configurations.
Characteristics
1 . High bearing capacity: The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.
2 . Safe with work platform: The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.
3 . The inclination of formwork is adjustable by means of adjustable brace: The brace is connected with formwork and bracket and the main function is guaranteeing the verticality of formwork by adjusting its length.
Value-added Service
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.