
Add to Cart
System slab formwork , column formwork , wall formwork , climbing system for tower project in Abu Dhabi
Project | Sector 1, Area 1, Al Reem Island |
Contractor/Client | Beijing Construction Engineering Group Co.-ABU DHABI |
Location | Abu Dhabi, U.A.E |
Table Formwork-Prop | The high-capacity system components are designed for optimum interoperability so that lots of time and labour costs can be saved. |
Flexible Column Formwork | This system can be exactly adapted to the shape and concrete pressure by adjusting the direction and distance between girders. |
Flexible Wall Formwork | The wall forms are used for almost any kind of wall construction. It goes well with the straight walls or walls with corners and projections. |
J240 Jumped Climbing Formwork | The system's specially co-ordinated components make it ideal for construction projects with vertical walls. Exact coordination of formwork equipment made for high numberof re-use cycles, low formwork quantities. |
Value-added Service:
ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.